FLEET SOLUTIONS
Handan Fuxing Bus Depot
60 kW plus 480 kW distributed systems — 3 main units powering 18 charging terminals for an electric bus fleet.
Oct 1, 2026
•
1 min read
Location: Handan, Hebei, China
A fleet depot installation for electric buses: 960 kW and 480 kW distributed charging systems with three main power units serving 18 charging terminals, sized for overnight and opportunity charging.
Key figures
| Capacity | 960 kW + 480 kW distributed |
|---|---|
| Main units | 3 |
| Charging terminals | 18 |
Share this article:
Tags:
DC Fast Charging
EV Technology
Charging Stations




